Resolve directing the Massachusetts Department of Transportation to study the feasibility of establishing a tunnel to connect the campuses of Essex North Shore Agricultural and Technical school ("ENSATS”)
Generates a plain-language summary of the bill text and history.
| Committee | Recommendation | Vote |
|---|---|---|
| J27 | Redraft | 1 entries |
| Bill | Title | Status |
|---|---|---|
| H3733 | Resolve directing the Massachusetts Department of Transportation to study the feasibility of extending the orange line | Active |
| S2389 | Resolve directing the Massachusetts Department of Transportation to conduct a highway noise study in the town of Foxborough | Active |
| S2442 | Resolve directing the Massachusetts Department of Transportation to study the feasibility of extending the orange line | Active |
Resolved, the Massachusetts Department of Transportation shall conduct a feasibility study relative to constructing a tunnel to connect the north and south campuses of the Essex North Shore Agricultural and Technical school, and Danvers Rail Trail, a section of the Massachusetts Rail Trail system. The study shall examine and evaluate the feasibility and benefits of such a project, including, but not limited to: (i) the projected capital costs; (ii) possible regulatory or statutory obstacles; (iii) measures that can be implemented to increase pedestrian safety, increase accessibility, and reduce traffic congestion; (iv) the availability of federal, state, local and private sector funding sources; and (v) considerations and measures necessary to protect the public safety in and around the tunnel. The department shall file the report with the clerks of the house and senate, the chairs of the house and senate committee on ways and means and the senate and house chairs of the joint committee on transportation not later than 12 months after this section takes effect.
Resolved, the Massachusetts Department of Transportation shall conduct a feasibility study relative to constructing a tunnel to connect the north and south campuses of the Essex North Shore Agricultural and Technical school, and Danvers Rail Trail, a section of the Massachusetts Rail Trail system. The study shall examine and evaluate the feasibility and benefits of such a project, including, but not limited to: (i) the projected capital costs; (ii) possible regulatory or statutory obstacles; (iii) measures that can be implemented to increase pedestrian safety, increase accessibility, and reduce traffic congestion; (iv) the availability of federal, state, local and private sector funding sources; and (v) considerations and measures necessary to protect the public safety in and around the tunnel. The department shall file the report with the clerks of the house and senate, the chairs of the house and senate committee on ways and means and the senate and house chairs of the joint committee on transportation not later than 12 months after this section takes effect.